RPZ/Backflow Preventer Testing

March 2, 2023

Larry’s Plumbing is a certified to test your backflow preventer and also perform your annual test and certification.



Residential or Commercial RPZ Testing A Reduced Pressure Zone Device (RPZD, RPZ or RPZ valve) is a type of backflow prevention device used to protect water supplies from contamination. RPZDs may also be known as reduced pressure principle backflow prevention devices, or reduced pressure zone assemblies.


An RPZD is considered suitable for high hazard applications, that is, where the consequence of backflow into the water supply would cause significant harm. They are considered suitable because they prevent both backflow and back-siphonage, because of a redundant design (even with two check valves broken the device still provides protection), and because they are testable to verify correct operation.


RPZD are often chosen instead of an air gap since the head loss across the RPZ is much smaller.


The device consists of two independent check valves, plumbed in series, with a pressure monitored chamber between. The chamber is maintained at a pressure that is lower than the water supply pressure, but high enough to be useful downstream.


The reduced pressure is guaranteed by a differential pressure relief valve, which automatically relieves excess pressure in the chamber by discharging to a drain. Four test cocks are installed to allow an inspector to verify proper operation of the valve with a differential pressure meter. Two gate valves (one before and one after the RPZ) are provided to allow for testing and repair.


Almost all villages and towns in the Chicago area, require you to have a backflow preventer test
completed on an annual basis.


Larry’s Plumbing is certified to perform this service.

I

f your house or business needs a required yearly test, contact us at your convenience to schedule your testing.

October 23, 2026
Condo Association Parking lot sewer repair. Rebuild storm sewer. Remove 4 parking blocks, saw cut approximately 8 X 8 around storm basin. Breakout asphalt and concrete, and haul away spoil. Install new spacer rings and bricks where needed. Seal inside and outside of basin, install new storm sewer lid and cover. Backfill 100 % stone and compact. Additional work was required. Once excavation started found we had to replace the whole manhole structure wall and some piping 8 inches.
October 23, 2026
Upon arrival met with Village water works, isolated main to complex. Disassembled water meter, removed flange. Cut out old valve and removed nipple from 4 x 3 bushing. Installed new valve and had village pressurize main. From there installed new 90 and re-tightened flange. Installed water meter fully tightened and pressurized building main. Tested for leaks and flow passed. Cleaned work area.
October 2, 2026
Arrived on site to replace tankless water heater under manufacture warranty. Turned off unit, water and gas. Disconnected service valves and supply lines. Cut out recirculating and condensation lines. Cut out section of exhaust pipe. Remove defective tankless water heater. Installed new tankless water heater and secured to wall. Installed new section of exhaust pipe with fittings and secured. Reconnect and re-piped all supplies then braced. Turned on unit and bled system. Contacted tech support to properly set up commercial tankless configuration per manufacture recommendations. Set temperature at 140°.