New Hydration Water Filling Station

March 2, 2023

Larry's Plumbing recently installed a hydration water filling station for one of our clients.


Hydration is essential for good health. Introducing Elkay's EZH2OTM bottle filling station
 
Ideal for education, healthcare facilities, fitness clubs, and hospitality


EZH2O bottle filling station provides convenient hydration, reduces our dependency on plastic water bottles, provides a rapid fill water to quench thirst and help minimize disposable plastic bottle waste in the environment.


QUICK, CLEAN + GREEN

–The EZH2O bottle filling station fill rate* is 1.1-1.5 gpm; 3 times faster than a traditional drinking fountain
–One-handed operation allows for a quick fill between activities
–The electronic sensor provides touchless, sanitary operation; just place and fill
–Available as Filterless or with the WaterSentry® Plus 3000 gallon filter is included (NSF 42 & 53 certified for particulate, chlorine, taste & odor and lead reduction)
–Integrated Silver Agion Anti-microbial protects against mold and mildew growth
–Innovative Green TickerTM counts the quantity of bottles saved from land fills


* Fill rate is 1.1 gpm for refrigerated units and 1.5 gpm for non-refrigerated units

October 23, 2026
Condo Association Parking lot sewer repair. Rebuild storm sewer. Remove 4 parking blocks, saw cut approximately 8 X 8 around storm basin. Breakout asphalt and concrete, and haul away spoil. Install new spacer rings and bricks where needed. Seal inside and outside of basin, install new storm sewer lid and cover. Backfill 100 % stone and compact. Additional work was required. Once excavation started found we had to replace the whole manhole structure wall and some piping 8 inches.
October 23, 2026
Upon arrival met with Village water works, isolated main to complex. Disassembled water meter, removed flange. Cut out old valve and removed nipple from 4 x 3 bushing. Installed new valve and had village pressurize main. From there installed new 90 and re-tightened flange. Installed water meter fully tightened and pressurized building main. Tested for leaks and flow passed. Cleaned work area.
October 2, 2026
Arrived on site to replace tankless water heater under manufacture warranty. Turned off unit, water and gas. Disconnected service valves and supply lines. Cut out recirculating and condensation lines. Cut out section of exhaust pipe. Remove defective tankless water heater. Installed new tankless water heater and secured to wall. Installed new section of exhaust pipe with fittings and secured. Reconnect and re-piped all supplies then braced. Turned on unit and bled system. Contacted tech support to properly set up commercial tankless configuration per manufacture recommendations. Set temperature at 140°.
More Posts